Emergency lighting testing and certification.
Because the lights can’t panic.
Emergency lighting is a key life-safety system, supporting safe evacuation during power loss or fire events. Routine testing helps meet responsibilities under fire safety duties and standards such as BS 5266, and keeps your building ready for inspection.
We carry out functional checks, duration testing, fault identification and compliant reporting – helping you protect occupants while reducing call-outs through planned maintenance.
Monthly flick testing from £46.
3-hour drain-down testing from £120.
Why Emergency Lighting Testing Matters.
Ensure safe evacuation during power failure.
Emergency lighting plays a critical role in guiding occupants to safety when normal lighting fails.
Identify faults before an emergency occurs.
Regular testing highlights failed lamps, batteries, or fittings before they are needed.
Reduce risk and liability.
Well-maintained emergency lighting systems help protect occupants and reduce exposure to legal or insurance issues.
Meet legal and compliance obligations.
Routine testing helps demonstrate compliance with fire safety and health & safety legislation.
Maintain clear records for audits and inspections.
Test results provide essential documentation for fire risk assessments, insurers, and enforcing authorities.
FAQs
Common questions about emergency lighting testing, frequencies, and costs.
What is emergency lighting testing?
Emergency lighting testing confirms that emergency luminaires operate correctly during a power failure and provide adequate illumination for the required duration.
What is a monthly flick test?
A monthly flick test is a brief functional test where emergency lights are switched on momentarily to confirm they illuminate correctly and that indicators are functioning.
What is a 3-hour drain-down test?
A 3-hour drain-down test involves simulating a mains power failure to confirm emergency lights operate for their full rated duration, typically three hours.
How often should emergency lighting be tested?
Monthly flick tests are typically carried out every month, with a full 3-hour duration test completed annually.
Will testing disrupt building use?
Testing is planned to minimise disruption, and any required shutdowns are agreed in advance.
Still have questions? Contact Us
Pricing & Scope
Monthly flick testing from £46
3-hour drain-down testing from £120
Pricing depends on the number of fittings, building size, and access requirements. Contact us to discuss your site and receive a clear, tailored quotation.




















